{"id":7712,"date":"2023-08-05T19:34:09","date_gmt":"2023-08-05T18:34:09","guid":{"rendered":"https:\/\/elwoc.org.uk\/?p=7712"},"modified":"2025-11-02T11:47:01","modified_gmt":"2025-11-02T11:47:01","slug":"neart-na-gaoithe-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/ourlocality.org\/elwoc\/2023\/08\/neart-na-gaoithe-offshore-wind-farm\/","title":{"rendered":"Neart Na Gaoithe Offshore Wind Farm"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-3e41869c wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"#latest_nng_news\">Latest NnG news<\/a><\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The Neart na Gaoithe (NnG) offshore wind farm will be located 15.5 km off the Fife coast and covers an area of approximately 105 km2. EDF Renewables UK acquired the project in May 2018 as part of a competitive bidding process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project has the potential to generate 450MW of renewable energy, which is enough power to supply around 375,000 Scottish homes \u2013 more than the whole of Edinburgh and will offset over 400,000 tonnes of CO2 emissions each year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The NnG site was chosen because it combines technical, economic and environmental deliverability. Some of the criteria that formed part of the site selection process included; water depth, ground condition, expected energy yield, access to port facilities and more.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NnG is one of two Scottish offshore wind farms to have won a Contract for Difference (CfD). It gives the wind farm an inflation-linked strike price for the electricity it produces for a period of 15 years. This revenue stream makes the project financeable and will enable it to reach financial close. A map of the proposed project is shown below:<\/p>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"808\" height=\"519\" src=\"https:\/\/elwoc.org.uk\/files\/2023\/07\/NnGLocation.webp\" alt=\"\" class=\"wp-image-7475\" srcset=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnGLocation.webp 808w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnGLocation-300x193.webp 300w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnGLocation-768x493.webp 768w\" sizes=\"auto, (max-width: 808px) 100vw, 808px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Project facts<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Neart na Gaoithe means \u2018Strength of the Wind\u2019.<\/li>\n\n\n\n<li>Comprises 54 x&nbsp;Siemens SWT-6.0-154 turbines with a rotor diameter of 154m.<\/li>\n\n\n\n<li>The project has the potential to generate 450MW of renewable energy.<\/li>\n\n\n\n<li>When fully operational, it will generate enough electricity to power over 375,000 households.<\/li>\n\n\n\n<li>NnG represents an investment of \u00a32 billion in Scotland\u2019s energy infrastructure.<\/li>\n\n\n\n<li>It will offset over 400,000 tonnes of CO2 emissions each year.<\/li>\n\n\n\n<li>Onshore grid connection is at Crystal Rig onshore wind farm near Dunbar, East Lothian.<\/li>\n\n\n\n<li>Distance of approximately 1 km between each turbine.<\/li>\n\n\n\n<li>The closest turbine will be a minimum of 15.5 km from the shore.<\/li>\n\n\n\n<li>The NnG site will be approximately 105 km2.<\/li>\n\n\n\n<li>It is expected to be commissioned in 2023<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>NnG Onshore Transmission Works<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u2022Onshore Transmission Works for Neart na Gaoithe (NnG) Offshore Wind Farm<\/li>\n\n\n\n<li>\u2022Joint venture between EDF Renewables and ESB<\/li>\n\n\n\n<li>\u2022Located 15.5 km from Fife coast, 30km from Torness in Firth of Forth<\/li>\n\n\n\n<li>\u2022Will produce up to 450 MW from 54 turbines providing power for around 375,000 homes<\/li>\n\n\n\n<li>\u2022Will offset over 400,000 tonnes of CO<sub>2<\/sub>&nbsp;emissions per year<\/li>\n\n\n\n<li>\u2022Planned operational life of 25 years, decommissioning or repowering possible thereafter<\/li>\n\n\n\n<li>\u2022Operations and maintenance base in Eyemouth creating around 50 permanent jobs<\/li>\n\n\n\n<li>\u2022Export cable landfall at Thorntonloch Beach, 12.5 km buried cable route to substation at Crystal Rig (Lammermuir Hills)&nbsp;<\/li>\n\n\n\n<li>\u2022Planning permission for onshore works granted in June 2013<\/li>\n\n\n\n<li>\u2022Onshore construction commenced 2020 by GE and Prysmian, expected completion late 2023<\/li>\n\n\n\n<li>\u2022Offshore construction commenced 2020, turbines expected to be installed summer 2023<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><a href=\"https:\/\/i0.wp.com\/eastlammermuircommunitycouncil.org.uk\/files\/2023\/07\/NnG-onshore-transmission.png?ssl=1\"><img loading=\"lazy\" decoding=\"async\" width=\"581\" height=\"669\" src=\"https:\/\/elwoc.org.uk\/files\/2023\/07\/NnG-onshore-transmission.png\" alt=\"\" class=\"wp-image-7479\" srcset=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnG-onshore-transmission.png 581w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnG-onshore-transmission-261x300.png 261w\" sizes=\"auto, (max-width: 581px) 100vw, 581px\" \/><\/a><figcaption class=\"wp-element-caption\">NnG Onshore Transmission Route<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Project Access Route (substation works)<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image alignwide size-full\"><a href=\"https:\/\/i0.wp.com\/eastlammermuircommunitycouncil.org.uk\/files\/2023\/07\/NnG-Project-Access-Route.png?ssl=1\"><img loading=\"lazy\" decoding=\"async\" width=\"1057\" height=\"834\" src=\"https:\/\/elwoc.org.uk\/files\/2023\/07\/NnG-Project-Access-Route.png\" alt=\"\" class=\"wp-image-7480\" srcset=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnG-Project-Access-Route.png 1057w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnG-Project-Access-Route-300x237.png 300w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnG-Project-Access-Route-1024x808.png 1024w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/NnG-Project-Access-Route-768x606.png 768w\" sizes=\"auto, (max-width: 1057px) 100vw, 1057px\" \/><\/a><figcaption class=\"wp-element-caption\">NnG Project Access Route<\/figcaption><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Standard working hours 07.00 \u2013 19.00, 7 days<\/li>\n\n\n\n<li>Quiet overnight works where necessary<\/li>\n\n\n\n<li>HGV movements limited to 07.00 \u2013 19.00<\/li>\n\n\n\n<li>Park and ride system and material delivery hub at Ark (Dunbar)<\/li>\n\n\n\n<li>20mph HGV speed limit from A1<\/li>\n\n\n\n<li>Permanent and temporary passing places and junction widening<\/li>\n\n\n\n<li>Regular road sweeping and litter picks<\/li>\n\n\n\n<li>Temporary road repairs in conjunction with ELC<\/li>\n\n\n\n<li>Demobilisation and reinstatement from May 2023 \u2013 increase in HGV movements<\/li>\n\n\n\n<li>Liaising with ELC Roads Dept on scope of permanent repairs following completion of construction works<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Contact:<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Neart na Gaoithe<\/strong><strong>&nbsp;<\/strong><strong>windfarm<\/strong><\/td><td><strong>NnG<\/strong><\/td><td><strong><a href=\"mailto:info@nngoffshorewind.com\">info@nngoffshorewind.com<\/a><\/strong>&nbsp;<strong>&nbsp;<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"latest_nng_news\">Latest News<\/h2>\n\n\n<ul class=\"wp-block-latest-posts__list is-grid columns-2 has-dates tw-mt-8 tw-heading-size-medium is-style-tw-posts-card tw-img-ratio-16-9 wp-block-latest-posts is-layout-flow wp-block-latest-posts-is-layout-flow\"><li><div class=\"wp-block-latest-posts__featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"131\" src=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/08\/cropped-burbo-offshore-windfarm.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"\" style=\"width:100%;height:21.06%;max-width:940px;\" srcset=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/08\/cropped-burbo-offshore-windfarm.jpg 940w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/08\/cropped-burbo-offshore-windfarm-300x63.jpg 300w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/08\/cropped-burbo-offshore-windfarm-768x162.jpg 768w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/ourlocality.org\/elwoc\/2023\/08\/neart-na-gaoithe-offshore-wind-farm\/\">Neart Na Gaoithe Offshore Wind Farm<\/a><time datetime=\"2023-08-05T19:34:09+01:00\" class=\"wp-block-latest-posts__post-date\">August 5, 2023<\/time><div class=\"wp-block-latest-posts__post-excerpt\">The Neart na Gaoithe (NnG) offshore wind farm will be&hellip; <a class=\"more-link\" href=\"https:\/\/ourlocality.org\/elwoc\/2023\/08\/neart-na-gaoithe-offshore-wind-farm\/\">Continue reading <span class=\"screen-reader-text\">Neart Na Gaoithe Offshore Wind Farm<\/span><\/a><\/div><\/li>\n<li><div class=\"wp-block-latest-posts__featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"336\" src=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/off-shore-wind-farm-e1689244340177.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"off shore wind farm\" style=\"width:100%;height:54.21%;max-width:961px;\" srcset=\"https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/off-shore-wind-farm-e1689244340177.jpg 961w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/off-shore-wind-farm-e1689244340177-300x163.jpg 300w, https:\/\/ourlocality.org\/elwoc\/files\/2023\/07\/off-shore-wind-farm-e1689244340177-768x416.jpg 768w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/div><a class=\"wp-block-latest-posts__post-title\" href=\"https:\/\/ourlocality.org\/elwoc\/2023\/07\/east-lothian-energy-infrastructure-projects\/\">East Lothian Energy Infrastructure Projects<\/a><time datetime=\"2023-07-23T12:07:55+01:00\" class=\"wp-block-latest-posts__post-date\">July 23, 2023<\/time><div class=\"wp-block-latest-posts__post-excerpt\">The next 10 years will see an unprecedented number of&hellip; <a class=\"more-link\" href=\"https:\/\/ourlocality.org\/elwoc\/2023\/07\/east-lothian-energy-infrastructure-projects\/\">Continue reading <span class=\"screen-reader-text\">East Lothian Energy Infrastructure Projects<\/span><\/a><\/div><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>The Neart na Gaoithe (NnG) offshore wind farm will be located 15.5 km off the Fife coast and covers an area of approximately 105 km2. EDF Renewables UK acquired the project in May 2018 as part of a competitive bidding process. The project has the potential to generate 450MW of renewable energy, which is enough&hellip; <a class=\"more-link\" href=\"https:\/\/ourlocality.org\/elwoc\/2023\/08\/neart-na-gaoithe-offshore-wind-farm\/\">Continue reading <span class=\"screen-reader-text\">Neart Na Gaoithe Offshore Wind Farm<\/span><\/a><\/p>\n","protected":false},"author":625,"featured_media":7675,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[43,52],"tags":[],"class_list":["post-7712","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elwoc","category-nng","entry"],"_links":{"self":[{"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/posts\/7712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/users\/625"}],"replies":[{"embeddable":true,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/comments?post=7712"}],"version-history":[{"count":5,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/posts\/7712\/revisions"}],"predecessor-version":[{"id":7885,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/posts\/7712\/revisions\/7885"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/media\/7675"}],"wp:attachment":[{"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/media?parent=7712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/categories?post=7712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ourlocality.org\/elwoc\/wp-json\/wp\/v2\/tags?post=7712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}