What we are doing
WHAT HAS BEEN DONE TO DATE
At inception the CRP was funded entirely by ScotRail with smaller projects being wholly funded provided they are included in our Action Plan, with larger projects being subject to a special application with a matched funding requirement. Today there is a blend of funding, which includes support from Transpennine and CrossCountry.
Projects & initiatives in chronological order
-
ELCRP Draft Action Plan 2014
One of the items included in the ScotRail franchise was to introduce bus/rail connectivity where possible throughout Scotland, and ScotRail has sought the assistance of… READ MORE
-
Timetabling Issues – Meeting with ScotRail
The object of the meeting was to discuss detailed timetable issues with Scott Prentice in order that an understanding could be gleaned regarding these, and… READ MORE
-
Response to Scotland Route Study consultation
ELCRP is pleased to note the proposed plans to increase line capacity by providing an additional line between Waverley and Portobello Junction and Craigentinny. It… READ MORE
-
Bus Rail Coordination in East Lothian
One of the items included in the ScotRail franchise was to introduce bus/rail connectivity where possible throughout Scotland, and ScotRail has sought the assistance of… READ MORE
-
Draft Station Action Plans 2014
The station audits and action plans have been developed based on input from organisations and individuals in the region and feedback from the survey undertaken… READ MORE
-
East Lothian Residents Survey
Between 1 July 2014 and 31 August 2014, the East Lothian Community Rail Partnership undertook a survey of local residents to gain insight into why… READ MORE
Other issues
ScotRail service issues of which we are aware and are attempting to tackle:
- Reliability with train cancellations and late running. Delay repay awareness very poor indeed
- Overcrowding – cover efforts to introduce train from Dunbar stopping at Musselburgh and possibly Prestonpans and Wallyford to bridge gap in morning peak services from Dunbar.
- Increasingly irregular timetable – not clock face. This matter is in the hands of Transport Scotland following our representations on bus/rail connectivity – see below.
- Drem terminations. In order to minimise delays on services where a late running train has been terminated at Drem, and North Berwick passengers are left stranded at Drem having to wait for the next train, ScotRail have in the past terminated some trains at Drem. The CRP believes this is a highly dangerous (and immoral) practice as high speed trains will pass Drem (line speed limit 115mph at this point) and it is only a question of time before a tragedy occurs. ScotRail Alliance’s previous Managing Director, Phil Verster, agreed this was to stop immediately, but occasionally it still happens.
- Increasing use of diesel trains, with reduced capacity, during the day and resultant re-timing of some journeys
- Fare collection: failure to collect all fares especially from stations nearer Edinburgh. Aware that Revenue Protection Inspectors are often deployed at Waverley with queues to exit the station often resulting in 20 minute plus waits to exit the platform which results in the breaking of the statutory 14 minute advertised connection time at Waverley to enable onwards connections to be met – particularly important for those with Advance Tickets because it is the arrival of the train that is automatically recorded to enable a valid claim to be made, not platform exit time.The provision of faster, more reliable ticket vending machines (TVMs) on platforms would result in fewer passengers not being able to purchase a ticket before boarding.ScotRail figures produced at the AGM in September 2016 show that 15% of fares are uncollected, mainly in the off peak periods.
- Unreliability of escalators and lifts at Waverley: The CRP has raised the issue of failing escalators and lifts with Network Rail, the operator of Waverley station, and in particular the situation where both can be out of service at the same time at one access point. It is also the case that many failures are in fact the result of routine maintenance which in the CRP’s opinion should not be carried out during the day. Princes Street shops do not close down their escalators during the day for maintenance other than in an emergency.
To see the minutes of our meeting with ScotRail in October 2016 on a number of services issue and in particular capacity, please click here
New cycle stands at some stations
New cycle stands have been located at both Drem and North Berwick stations. With the probability of a new cycle path from Gullane to Drem, the additional capacity at Drem will prove useful and is in place before the new path is completed.
Bus-rail connectivity
Without doubt the most difficult and complicated item to achieve due to the complexities of the rail timetable and the fact that East Lothian trains are subordinate to East Coast main line services, legislation affecting both rail and bus operations, the Equality Act (2010) all of which conspire to make a totally robust, disability compliant bus/rail connectivity facility very difficult to achieve. With the full support of East Lothian Council, the CRP is currently trying via the Scottish Parliament to make changes to bus legislation which would result in many of the problems being reduced and eliminated.
The CRP aspires to have bus/rail connectivity at North Berwick connecting with the current 120 Dunbar – North Berwick and 121 Haddington – North Berwick bus services. It is also supportive of East Coast Buses service 124 (Edinburgh – North Berwick) connecting with trains at Longniddry to provide robust connections to/from Aberlady and Gullane and trains at Longniddry.
In addition, there is considerable scope for connectivity at Dunbar but much work requires to be done in this regard. In December 2019, Trans-Pennine Express services will be extended hourly from Newcastle to Edinburgh via Berwick and we believe Dunbar and this piece of the jigsaw will need to be in place before changes to bus services in Dunbar are considered.
Submission to Traffic Commissioner Scotland
Notice boards at all East Lothian stations (a work in progress)
The CRP has agreed in principle with ScotRail to have their own notice boards at each station capable of taking desk top published A4 notices of specific local relevance, including directions, and other items that will assist passengers.
Working with Living Streets regarding signage at all East Lothian stations
The CRP will undertake an audit on signage and access at all stations. This will involve station adopters, input from Living Streets, and members of the CRP Board and stakeholders.
Toilets at North Berwick station
The CRP is very aware that, apart from at Dunbar which is a staffed station, that current ScotRail policy is that at unstaffed stations will not have any platform based toilet facilities. This is proving particularly difficult for passengers who expect toilets to be provided at North Berwick where the station is situated away from the town centre. A special arrangement has been made with The Westgate Gallery (3 minute walk towards town centre) that rail passengers may use their toilets when they are open.
East Lothian Council have identified a location very close to the station where it is hoped that planning permission for toilet facilities will be granted. It is however understood that funding has still to be found.
Possibility of some entertainment on trains
The CRP, in line with some other areas, is investigating the possibility of some limited entertainment on trains during the Fringe by the Sea week at North Berwick and also the Dunbar Festival. This is at a very early stage of development.
You must be logged in to post a comment.